Developing Adaptive Project Construction Cost Control Using Multi-Nonlinear Regression Engineering Techniques

Authors

  • Maaroof Aqeel Maaroof Maaroof
  • Sepanta Naimi Engineering and Architectural Faculty, Department of Civil Engineering, Altınbaş Üniversitesi, Bağcılar 34217, Istanbul, Turkey

Keywords:

planning value, multi-nonlinear regression method, actual value

Abstract

Construction project management using the techniques of multi-nonlinear regression method was the branch that the study dealt with in its pathway. The study identified and evaluated the impact of various factors like the project elements including the building specification impact, the building location effect, the soil effect, and the construction process factor impacts. on the cost of the project. the study analyzed the data toward building an effective model based on multi-nonlinear regression method for controlling the project from the initial phase toward the final implementation stage. The study outline was to reach adaptive management of the construction project under the conditions in Iraq to enhance the performance of the management team in the construction sector. The findings show that using a project control's actual values improves project management teams' capacity to recognize cost and schedule concerns on time.

Downloads

Download data is not yet available.

References

S. NAIMI and M. A. KARIMI, “Pavement Management System Investigation in Case of Afghanistan,” Cumhur. Sci. J., no. March, 2019, doi: 10.17776/csj.471334.

M. M. Tuuli, S. Rowlinson, and Y. T. Koh, “Control modes and mechanisms in construction project teams: Drivers and consequences,” Constr. Manag. Econ., vol. 28, no. 5, pp. 451–465, 2010, doi: 10.1080/01446191003702500.

M. Celikag and S. Naimi, “Building construction in North Cyprus: Problems and alternatives solutions,” Procedia Eng., vol. 14, no. December 2011, pp. 2269–2275, 2011, doi: 10.1016/j.proeng.2011.07.286.

A. M. Elewe, K. Bin Hasnan, and A. Bin Nawawi, “Hybridized firefly algorithm for multi-objective Radio Frequency Identification ( RFID ) Network planning HYBRIDIZED FIREFLY ALGORITHM FOR MULTI-OBJECTIVE RADIO FREQUENCY IDENTIFICATION ( RFID ) NETWORK PLANNING,” no. February, 2017.

E. Ali, S. Lynn, S. Issam, and P. William, “Construction Control Room for Project Monitoring and Control,” no. July, pp. 30–39, 2020, doi: 10.3311/ccc2020-020.

K. Hasnan et al., “An efficient algorithm for larg-scale RFID network planning,” no. May, 2017, doi: 10.1109/ICITECH.2017.8079927.

K. B. Khoury, “Effective communication processes for building design, construction, and management,” Buildings, vol. 9, no. 5, 2019, doi: 10.3390/buildings9050112.

P. Nowotarski, J. Pasławski, and J. Matyja, “Improving Construction Processes Using Lean Management Methodologies - Cost Case Study,” Procedia Eng., vol. 161, pp. 1037–1042, 2016, doi: 10.1016/j.proeng.2016.08.845.

N. H. Talib, K. Bin Hasnan, A. Binnawawi, A. Elewe, and H. B. Abdullah, “Multi objective optimization of Indoor UHF RFID Network Based on Gradient - Cuckoo search,” IOP Conf. Ser. Mater. Sci. Eng., vol. 824, no. 1, 2020, doi: 10.1088/1757-899X/824/1/012012.

A. M. Keshk, I. Maarouf, and Y. Annany, “Special studies in management of construction project risks, risk concept, plan building, risk quantitative and qualitative analysis, risk response strategies,” Alexandria Eng. J., vol. 57, no. 4, pp. 3179–3187, 2018, doi: 10.1016/j.aej.2017.12.003.

N. Talib et al., “GRADIENT-BASED CUCKOO SEARCH ( GBCS ) AND ( MC-GPSO ) TECHNIQUES FOR OPTIMAL RFID NETWORK PLANNING,” no. March, 2019.

S. Naimi and M. Celikag, “Problems of Reinforced Concrete Building,” no. April 2010, 2014.

I. Nechaeva, “Building Information Modelling (Bim) in Construction Project Managementin Russia,” Proj. Manag. Dev. Perspect. Fifth Int. Sci. Conf. Proj. Manag. Balt. Ctries., no. May, pp. 213–225, 2016, doi: 10.13140/RG.2.1.3199.7044.

D. Zuppa, R. R. A. Issa, and P. C. Suermann, “BIM’s impact on the success measures of construction projects,” Proc. 2009 ASCE Int. Work. Comput. Civ. Eng., vol. 346, no. December 2017, pp. 503–512, 2009, doi: 10.1061/41052(346)50.

H. J. Bargstädt, “Challenges of BIM for construction site operations,” Procedia Eng., vol. 117, no. 1, pp. 52–59, 2015, doi: 10.1016/j.proeng.2015.08.123.

Y. Arayici, C. Egbu, and P. Coates, “Building information modelling (Bim) implementation and remote construction projects: Issues, challenges, and critiques,” Electron. J. Inf. Technol. Constr., vol. 17, no. May, pp. 75–92, 2012.

N. H. Ham, K. M. Min, J. H. Kim, Y. S. Lee, and J. J. Kim, “A study on application of BIM(Building Information Modeling) to Pre-design in construction project,” Proc. - 3rd Int. Conf. Converg. Hybrid Inf. Technol. ICCIT 2008, vol. 1, no. May 2014, pp. 42–49, 2008, doi: 10.1109/ICCIT.2008.190.

L. I. Heng and L. I. Hong-Yu, “Applications of BIM in Construction Engineering in China A Review,” E3S Web Conf., vol. 143, 2020, doi: 10.1051/e3sconf/202014301007.

S. Rokooei, “Building Information Modeling in Project Management: Necessities, Challenges and Outcomes,” Procedia - Soc. Behav. Sci., vol. 210, no. February, pp. 87–95, 2015, doi: 10.1016/j.sbspro.2015.11.332.

P. Matějka and A. Tomek, “Ontology of BIM in a Construction Project Life Cycle,” Procedia Eng., vol. 196, no. June, pp. 1080–1087, 2017, doi: 10.1016/j.proeng.2017.08.065.

R. R. Politi, “Project Planning and Management Using Building Information Modeling (BIM),” PQDT - Glob., no. September, p. 101, 2018.

K. M. Alizadeh, J. S. Bajgiran, and E. R. Nik, “Building information modeling (BIM): A study to prioritize applications, risks and challenges,” Proc. Int. Conf. Ind. Eng. Oper. Manag., vol. 8-10 March 2016, no. March, pp. 2774–2780, 2016.

W. N. S. Wan Mohammad, M. R. Abdullah, S. Ismail, and R. Takim, “Overview of Building Information Modelling (BIM) adoption factors for construction organisations,” IOP Conf. Ser. Earth Environ. Sci., vol. 140, no. 1, 2018, doi: 10.1088/1755-1315/140/1/012107.

N. B. M. Zaid, N. Hamzah, and M. A. Khoiry, “Review Building Information Modelling for Infrastructure: Benefits for Constructor,” J. Comput. Theor. Nanosci., vol. 17, no. 2, pp. 620–628, 2020, doi: 10.1166/jctn.2020.8747.

H. Lindblad, “‘Study of the implementation process of BIM in construction projects: Analysis of the barriers limiting BIM adopotion in the AEC industry,’” MSc Thesis, no. 263, p. 64, 2013.

B. Akhmetzhanova, A. Nadeem, M. A. Hossain, and J. R. Kim, “Clash Detection Using Building Information Modeling (BIM) Technology in the Republic of Kazakhstan,” Buildings, vol. 12, no. 2, 2022, doi: 10.3390/buildings12020102.

M. Zoghi and S. Kim, “Dynamic modeling for life cycle cost analysis of BIM-based construction waste management,” Sustain., vol. 12, no. 6, 2020, doi: 10.3390/su12062483.

A. R. Zulkifli, C. K. I. C. Ibrahim, and S. Belayutham, “The Integration of Building Information Modelling (BIM) and Prevention Through Design (PtD) Towards Safety in Construction: A Review,” Lect. Notes Civ. Eng., vol. 139 LNCE, no. April, pp. 271–283, 2021, doi: 10.1007/978-981-33-6560-5_28.

A. A. Latiffi, S. Mohd, N. Kasim, and M. S. Fathi, “Building Information Modeling ( BIM ) Application in Malaysian Construction Industry,” vol. 2, no. January, pp. 1–6, 2013, doi: 10.5923/s.ijcem.201309.01.

M. Fernanda, S. Rodrigues, J. Santos Baptista, F. Rodrigues, J. Santos Baptista, and D. Pinto, “BIM Approach in Construction Safety-A Case Study,” no. November, 2021, doi: 10.20944/preprints202111.0053.v1.

D. Larasati, Y. Hanifah, F. A. Willis, F. I. Nugrahanti, and I. H. Lubis, “BIM Implementation to Improve Construction Work Performance,” IOP Conf. Ser. Earth Environ. Sci., vol. 532, no. 1, 2020, doi: 10.1088/1755-1315/532/1/012024.

B. Nikmehr, M. R. Hosseini, J. Wang, N. Chileshe, and R. Rameezdeen, “Bim-based tools for managing construction and demolition waste (Cdw): A scoping review,” Sustain., vol. 13, no. 15, 2021, doi: 10.3390/su13158427.

S. Pai and A. Shriwas, “Time and Cost Planning of a Housing Construction Project Using Building Information Modelling,” J. Constr. Res., vol. 1, no. 2, pp. 18–24, 2020, doi: 10.30564/jcr.v1i2.1155.

Z. Pučko, N. Nataša, and U. Klanšek, “Building Information Modeling Based Time And Cost Planning In Construction Projects,” Organ. Technol. Manag. Constr. An Int. J., vol. 6, no. 1, 2014, doi: 10.5592/otmcj.2014.1.6.

E. Elbeltagi, O. Hosny, M. Dawood, and A. Elhakeem, “BIM-Based Cost Construction Estimation / Monitoring For Building,” Emad Elbeltagi Int. J. Eng. Res. Appl., vol. 4, no. 7, pp. 56–66, 2014.

Downloads

Published

28.02.2023

How to Cite

Maaroof Maaroof, M. A. ., & Naimi, S. . (2023). Developing Adaptive Project Construction Cost Control Using Multi-Nonlinear Regression Engineering Techniques. International Journal of Intelligent Systems and Applications in Engineering, 11(4s), 579 –. Retrieved from https://ijisae.org/index.php/IJISAE/article/view/2729

Issue

Section

Research Article