Fuzzy AHP Based New Questionnaire Process for Improving Judgments Under Agile Software Development Framework

Authors

  • Sangeeta Mishra, Mohd. Haroon

Keywords:

Risk assessment; analytical hierarchy process (AHP); Triangular fuzzy membership function.

Abstract

An efficient approach of risk assessment that uses a questionnaire to get expert replies is the fuzzy analytical hierarchy process (FAHP). However, the FAHP has significant challenges to establish a consistent judgment matrix & determination of the fuzzy membership function (MF). This study suggests a brand-new consultation procedure to address the triangular MF FAHP's prior issues. The suggested procedure includes a newly constructed questionnaire and a novel scheme to figure out the fuzzy MF. Responses of experts to the questionnaire were used to build a consistent judgment matrix and determine the membership function. For the intent of proving the proposed scheme's viability, it is used to the security assessment in agile software development. In the case study, the judgment matrix is created using both the classic and new questionnaires. The outcomes demonstrate that judgment matrix established using the proposed approach may produce a consistent judgment matrix and determine triangular fuzzy MF. The proposed questionnaire, as opposed to the standard one, may be helpful for quickly and conveniently gathering expert opinions.

Downloads

Download data is not yet available.

References

Zhang, L., M. J. Skibniewski, X. Wu, Y. Chen, and Q. Deng. 2014 “ A probabilistic approach for safety risk analysis in metro construction.” Saf. Sci. 63 (Mar): 8–17.

Shen, S. L., H. N. Wu, Y. J. Cui, and Z. Y. Yin. 2014. “Long-term settlement behavior of the metro tunnel in Shanghai.” Tunnelling Underground Space Technol.40(Feb):309323.

Awolusi,I.G.,andE.D.Marks.2017.“Safetyactivityanalysisframeworkto evaluate safety performance in construction.” J. Constr. Eng. Manage.143 (3): 05016022.

Kuo, Y. C., and S. T. Lu. 2013. “Using fuzzy multiple criteria decisionmakingapproachtoenhanceriskassessmentformetropolitanconstructionprojects.”Int.J.ProjectManage.31 (4):602–614.

Samantra, C., S. Datta, and S. S. Mahapatra. 2017. “Fuzzy based risk assessment module for metropolitan construction project: An empiricalstudy.”Eng.Appl.ArtifiIntell.65(Oct):449–464.

Wang, G. F., Y. X. Wu, L. Lu, G. Li, and J. S. Shen. 2019a. “Investigation of the geological and hydrogeological environment with relation to metro system construction in Jinan, China.” Bull. Eng. Geol. Environ. 78 (2): 1005–1024.

Wang, X. W., T. L. Yang, Y. S. Xu, and S. L. Shen. 2019b. “Evaluation of optimized depth of waterproof curtain to mitigate negative impacts during dewatering.” J. Hydrol. 577 (Oct): 123969.

Wu, Y. X., H. M. Lyu, J. Han, and S. L. Shen. 2019. “Dewatering-induced building settlement around a deep excavation in the soft deposit of Tianjin, China.” J. Geotech. Geoenviron. Eng. 145 (5): 05019003.

Tan, Y., B. Wei, X. Zhou, and Y. Diao. 2015. “Lessons learned from con- struction of Shanghai metro stations: Importance of quick excavation, prompt propping, timely casting and segmented construction.”J. Perform. Constr. Facil. 29 (4): 04014096.

Liu, J. Y., P. X. W. Zou, and W. Gong. 2013. “Managing project risk at the enterprise level: Exploratory case studies in China.” J. Constr. Eng. Manage. 139 (9): 1268–1274.

Xu, Y. S., S. L. Shen, Y. Lai, and A. N. Zhou. 2018. “Design of sponge city: Lessons learnt from an ancient drainage system in Ganzhou, China.”J. Hydrol. 563 (Aug): 900–908.

Zou, P. X. W., G. M. Zhang, and J. Y. Wang. 2007. “Understanding the key risks in construction projects in China.” Int. J. Project Manage. 25 (6): 601–614.

Zou, P. X. W., and G. Zhang. 2009. “Comparative study on the perception of construction safety risks in China and Australia.” J. Constr. Eng. Manage. 135 (7): 620–627..

Li, J., and P. X. W. Zou. 2011. “Fuzzy AHP-based risk assessment methodology for PPP projects.” J. Constr. Eng. Manage. 137 (12): 1205– 1209.

Wang, J., and H. Yuan. 2011. “Factors affecting contractors’ risk attitudes in construction projects: Case study from China.” Int. J. Project Manage. 29 (2): 209–219..

Nezarat, H., F. Sereshki, and M. Ataei. 2015. “Ranking of geological risks in mechanized tunneling by using Fuzzy Analytical Hierarchy Process (FAHP).” Tunnelling Underground Space Technol. 50 (Aug): 358–3642nd ed., vol. 3, J. Peters, Ed. New York, NY, USA: McGraw-Hill,1964,pp.15–64.

Peng, J., and F. L. Peng. 2018. “A GIS-Based evaluation method of under- ground space resource for urban spatial planning: Part 1: Methodology.” Tunneling Underground Space Technol. 74 (Apr): 82–95. [18] Li, F., K. K. Phoon, X. Du, and M. Zhang. 2013. “Improved AHP method and its application in risk identification.” J. Constr. Eng. Manage. 139 (3): 312–320.

Nnaji, C., H. W. Lee, A. Karakhan, and J. Gambatese. 2018. “Developing a decision-making framework to select safety technologies for highway construction.” J. Constr. Eng. Manage. 144 (4): 04018016.. [20] Lyu, H. M., Y. X. Wu, J. S. Shen, and A. N. Zhou. 2018c. “Assessment of social-economic risk of Chinese dual land use system using fuzzy AHP.” Sustainability 10 (7): 2451.

Hamidi, J. K., K. Shahriar, B. Rezai, J. Rostami, and H. Bejari. 2010. “Risk assessment based selection of rock TBM for adverse geological condi- tions using Fuzzy-AHP.” Bull. Eng. Geol. Environ. 69 (4): 523–532

Veerabathiran, R., and K. A. Srinath. 2012. “Application of the extent analy- sis method on fuzzy AHP.” Int. J. Eng. Sci. Technol. 4 (7): 3472–3480.

Zhao, X. 2017. “AHP-ANP-Fuzzy integral integrated network for evaluating performance of innovative business models for sustainable building.” J. Constr. Eng. Manage. 143 (8): 04017054.

Lee, S. 2015. “Determination of priority weights under multiattribute decision-making situations: AHP versus Fuzzy AHP.” J. Constr. Eng. Manage. 141 (2): 05014015

Gao, J., Z. Xu, D. Liu, and H. Cao. 2014. “Application of the model based on fuzzy consistent matrix and AHP in the assessment of fire risk of subway tunnel.” Procedia Eng.71:591–596.

Abdelgawad, M., and A. R. Fayek. 2010. “Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP.”J. Constr. Eng. Manage. 136 (9): 1028–1036.

Lyu, H. M., J. S. Shen, and A. Arulrajah. 2018a. “Assessment of geoha- zards and preventative countermeasures using AHP incorporated with GIS in Lanzhou, China.” Sustainability 10 (2): 304.

Lyu, H. M., W. J. Sun, S. L. Shen, and A. Arulrajah. 2018b.“Flood risk assessment in metro systems of mega-cities using a GIS-based model- ing approach.” Sci. TotalEnviron. 626 (Jun): 1012–1025.

Siddiqui M. M, Srivastava G, Saeed S. H. Diagnosis of Nocturnal Frontal Lobe Epilepsy (NFLE) Sleep Disorder Using Short Time Frequency Analysis of PSD Approach Applied on EEG Signal. Biomed Pharmacol J 2016;9(1)

Ismail, A., A. M. Abd, and Z. B. Chik. 2008. “Approach to analyze risk factors for construction projects utilizing fuzzy logic.” J. Appl. Sci. 20 (8): 3738–3742.

Sotoodeh,G.A.,M.Khanzadi,J.M.Parchami,andJ.A.A.Shirzadi.2009.“Construction projects risk assessment based on fuzzy AHP.” InProc., 2009 Student Conf. on Research and Development (SCOReD 2009),570573.SeriKembangan,Malaysia:UPMSerdang.

Işik, Z., and H. Aladağ. 2017. “A fuzzy AHP model to assess sustainableperformanceoftheconstructionindustryfromurbanregenerationperspective.” J. Civil Eng. Manage. 23(4):499–509.

Tavakolan, M., H. Etemadinia, M. Tavakolan, and H. Etemadinia. 2017. “Fuzzy weighted interpretive structural modeling: Improved method for identification of risk interactions in construction projects.” J. Constr. Eng. Manage. 143 (11): 04017084.

Liou, T. S., and M. J. J. Wang. 1992. “Ranking fuzzy numbers with integral value.” Fuzzy Sets Syst. 50 (3): 247–255.

Lyu, H. M., S. L. Shen, J. Yang, and Z. Y. Yin. 2019a. “Inundation analysis of metro systems with the storm water management model incorporated into a geographical information system: A case study in Shanghai.” Hydrol. Earth Syst. Sci. 23 (10): 4293–4307.

Lyu, H. M., S. L. Shen, A. N. Zhou, and W. H. Zhou. 2019b. “Flood risk assessment of metro systems in a subsiding environment using the interval FAHP-FCA approach.”Sustainable Cities Soc. 50 (Oct): 101682.

Zou, Q., J. Zhou, C. Zhou, L. Song, and J. Guo. 2013. “Comprehensive flood risk assessment based on set pair analysis-variable fuzzy sets model and fuzzy AHP.” Stochastic Environ. Res. Risk Assess. 27 (2): 525–546.

Boender, C. G. E., J. G. de Graan, and F. A. Lootsma. 1989. “Multicriteria decision analysis with fuzzy pairwise comparisons.” Fuzzy Set Syst. 29 (2): 133–143.

Triantaphyllou, E., and S. Mann. 1990. “An evaluation of the eigenvalueapproachfordeterminingthemembershipvaluesinfuzzysets.”Fuzzy SetSyst. 35 (3):295–301.

Patel,D.A.,K.D.Kikani,andK.N.Jha.2016.“Hazardassessmentusingconsistent fuzzy preference relations approach.”J.Constr.Eng.Manage.142 (12):04016067.

Chen, S. J., C. Hwang, M. Beckmann, and W. Krelle. 1992. Fuzzy multiple attribute decision making: Methods and applications. Berlin: Springer.

Sugihara, K., and H. Ishi. 2001. “Fuzzy AHP with incomplete information.”InProc.,IFSA/NAFIPS2001IEEE,2730–2733.Piscataway,NJ:IEEE.

Saaty,T.L.1977.“A scaling method for priorities in hierarchical structures.”J.Math.Psychol.15 (3):234281.

Saaty, T. 1980. The analytic hierarchy process. New York: McGraw-Hill.

Siddiqui M. M, Jain R. Prediction of REM (Rapid Eye Movement) Sleep Behaviour Disorder using EEG Signal applied EMG1 and EMG2 Channel. Biomed Pharmacol J 2021;14(1)..

Leung, L. C., and D. Cao. 2000. “On consistency and ranking of alternatives in fuzzy AHP.” Eur. J. Oper. Res. 124 (1): 102–113.

Kahraman, C., D. Ruan, and I. Dogan. 2003. “Fuzzy group decision- making for facility location selection.” Inf. Sci. 157 (Dec): 135–153.

Chang, D. Y. 1996. “Applications of the extent analysis method on fuzzy AHP.”Eur. J. Oper. Res. 95 (3): 649–655.

Wang, G. F., H. M. Lyu, J. S. Shen, and L. H. Lu. 2017. “Evaluation of environmental risk due to metro system construction in Jinan, China.” Int. J. Environ. Res. Public Health 14 (10): 1114.

Siddiqui, Mohd Maroof, et al, "Detection of Rapid Eye Movement Behaviour Sleep Disorder using Time and Frequency Analysis of EEG Signal Applied on C4-A1 Channel". Communication and Power Engineering, 2017, pp. 310- 326.

Shen, S. L., Q. L. Cui, C. E. Ho, and Y. S. Xu. 2016. “Ground response to multiple parallel microtunneling operations in cemented silty clay and sand.” J. Geotech. Geo environment. Eng. 142 (5): 04016001

Downloads

Published

16.03.2024

How to Cite

Mohd. Haroon, S. M. (2024). Fuzzy AHP Based New Questionnaire Process for Improving Judgments Under Agile Software Development Framework. International Journal of Intelligent Systems and Applications in Engineering, 12(3), 1263–1271. Retrieved from https://ijisae.org/index.php/IJISAE/article/view/5407

Issue

Section

Research Article